當前位置:首頁 > 科普知識 > 水電工程圍堰設(shè)計 > 列表
水電工程圍堰設(shè)計 共有 28 個詞條內(nèi)容

6.7 Materials of cofferdam body

    6.7.1 The filling materials for earth-rockfill cofferdam shallconform to the following provisions.(1) The permeability coefficient of impervious earth material shouldnot be larger than 1×10-4 cm/s. The local weathered material orgravel soil utilized in co...[繼續(xù)閱讀]

水電工程圍堰設(shè)計

7.1 General requirements

    7.1.1 The treatment of cofferdam foundation shall meet thefollowing requirements.(1) Seepage stability and quantity control for foundation.(2) Cofferdam deformation and uneven settlement.(3) Stability of cofferdam body.7.1.2 The treatment scheme of coffer...[繼續(xù)閱讀]

水電工程圍堰設(shè)計

7.2 Treatment of seepage control

    7.2.1 The measures of seepage control for cofferdam foundationoverburden shall be reliable in seepage control and convenient inconstruction.7.2.2 The blanket seepage control should be utilized when thefollowing factors are all possessed.(1) The retaining ...[繼續(xù)閱讀]

水電工程圍堰設(shè)計

7.3 Protective treatment of cofferdam foot

    7.3.1 The protective measures for cofferdam foot of water-side facein overburden of earth-rockfill cofferdam foundation shall bedetermined based on the hydraulics conditions of foot area anderosion resistance of overburden. The protective materials, which...[繼續(xù)閱讀]

水電工程圍堰設(shè)計

7.4 Other treatments

    7.4.1 For the earth-rockfill cofferdam built in valley region, thebank slope connected with soil impervious body shall be excavatedsmoothly, and the bank slope shall not be provided with vertical step,adverse slope or abrupt variable slope. The gradient o...[繼續(xù)閱讀]

水電工程圍堰設(shè)計

8.1 Construction of cofferdam

    8.1.1 The cofferdam construction shall meet the requirements ofconstruction progress and flood protection during flood season. Forthe construction design of cofferdam, the construction progress,technique, sequence, method, the allocation of constructionma...[繼續(xù)閱讀]

水電工程圍堰設(shè)計

8.2 Dismantling of cofferdam

    8.2.1 The dismantling design of cofferdam shall conform to thefollowing requirements, upon which the dismantling scope andtiming shall be determined.(1) It shall not affect the normal operation of permanent buildings.(2) It shall meet the requirements of ...[繼續(xù)閱讀]

水電工程圍堰設(shè)計

9 Monitoring

    9.0.1 Necessary monitoring items shall be provided to ensure thesafety operation of cofferdam. The monitoring methods includepatrolling and instrumentation.9.0.2 For the safety design of cofferdam, the monitoring items shallbe proposed based on the projec...[繼續(xù)閱讀]

水電工程圍堰設(shè)計
科普知識
心理健康 優(yōu)生優(yōu)育 休閑旅游 健身美容 飲食健康 人與自然 地球家園 海洋技術(shù) 科海拾貝 科學(xué)之迷 科技前沿 科技史話 科幻未來 神話傳說 童話故事 致富指南 農(nóng)用物資 生物技術(shù) 畜牧獸醫(yī) 園林花卉 特產(chǎn)養(yǎng)殖 營養(yǎng)早餐 減肥晚餐 晚餐食譜 營養(yǎng)晚餐 減肥中餐 中餐文化 中餐菜譜 中餐營養(yǎng) 健康早餐 減肥早餐 早餐食譜 晚餐禁忌 寶石鑒定 安全生產(chǎn) 安裝鉗工 鈑金技術(shù) 寶石觀察 焙烤工業(yè) 變性淀粉 插花技能 車工技術(shù) 道路工程 低壓電器 電氣工程 電氣設(shè)備 電網(wǎng)工程 電源技術(shù) 電站工程 淀粉科學(xué) 調(diào)味配方 發(fā)電節(jié)能 防水材料 飛機飛行 服裝生產(chǎn) 鋼鐵材料 工程建設(shè) 工業(yè)工程 公路工程 管道工程 罐頭工業(yè) 國際組織 國家電網(wǎng) 華北電網(wǎng) 火電工程 貨運物流 機床設(shè)計 機電工程 機修鉗工 基本資料 家用電器 建設(shè)工程 節(jié)約用電 金銀技術(shù) 金屬材料 連續(xù)鑄鋼 輪機工程 奶牛養(yǎng)殖 農(nóng)村電工 配電技術(shù) 皮革工業(yè) 啤酒工業(yè) 蘋果產(chǎn)業(yè) 鉗工簡明 青工車工 青年審美 肉類工業(yè) 入侵檢測 食品科學(xué) 世界修船 獸醫(yī)獸藥 水下工程 稅收制度 通信設(shè)備 統(tǒng)計公文 土木工程 維修電工 味精工業(yè) 文物鑒賞 物業(yè)電工 銑工計算 線損管理 鞋楦設(shè)計 煙草工業(yè) 鹽業(yè)產(chǎn)品 冶金產(chǎn)品 液壓技術(shù) 印刷科技 用電管理 油墨技術(shù) 軋鋼技術(shù) 粘接技術(shù) 照明設(shè)計 制漿造紙 土元養(yǎng)殖 兔場疾病 外國美術(shù)